California’s net billing tariff explained for commercial solar

California's net billing tariff credits exported solar power at hourly values well below retail. Here is what that means for San Diego businesses planning commercial solar.

By the San Diego Green Chamber · Updated November 2026

Facilities manager and solar designer reviewing an energy chart on a rooftop

California’s net billing tariff (NBT) is the rule that sets how SDG&E, PG&E and SCE customers with new solar systems are credited for power they send to the grid. Instead of earning roughly the retail rate for exports, as under the older net energy metering (NEM) programs, NBT customers earn export credits based on hourly values that are generally much lower. For businesses, the result is simple: solar now pays best when you use the power on site, and storage often matters.

How net billing works

The CPUC adopted the net billing tariff in December 2022, and it applies to most new solar interconnection applications submitted from April 15, 2023. Under NBT, three things happen at once.

  1. Power your system produces and you use immediately offsets your bill at your full time-of-use rate.
  2. Power you export earns a credit based on hourly values set through the CPUC’s avoided cost calculator. Those values vary by hour, day type and month, and are highest on some late summer evenings and lowest in the middle of most days.
  3. Power you draw from the grid is billed at your normal time-of-use rate. NBT customers must be on an eligible time-of-use rate schedule.

Export values are set ahead of time and locked for a period after you interconnect, so check the current details and lock-in terms with your installer and on the CPUC’s site.

Who it affects

The tariff applies to new solar customers of the investor-owned utilities, including commercial customers. If your business is in a community served by San Diego Community Power or Clean Energy Alliance, SDG&E still handles the interconnection and delivery, but your community choice provider sets its own generation rates and may treat export credits differently. Ask your provider and installer how it works for your account.

If you already have solar

Businesses that interconnected under NEM 1.0 or NEM 2.0 generally keep their existing terms for a legacy period measured from their original interconnection date, which has been 20 years. Major changes, such as significantly expanding the system, can affect that status. Before you add panels or batteries to an existing system, confirm with SDG&E and your installer how the change will be treated.

What it means for system design

Under NEM, many businesses sized systems to cover their annual usage and let the grid act as a bank. Under NBT, that approach usually wastes money. Better designs follow a few rules:

  • Size to daytime load. Aim to use most of the solar output on site. An oversized system exports power at low value.
  • Look at your load profile. Offices, retail, light manufacturing and cold storage with strong daytime demand fit solar well.
  • Consider storage. A battery can store midday solar for the evening peak and can trim demand charges. See our guide to battery storage for San Diego businesses.
  • Shift flexible loads. Running pumps, pre-cooling, EV charging and some processes at midday puts more solar to work.
  • Mind the orientation. West-facing panels produce more in the late afternoon, when power is more valuable, though total output may be lower.

Climate plays a part too. A building in El Cajon or Escondido with heavy afternoon cooling uses more of its own solar than a coastal office in La Jolla or Del Mar with mild temperatures and morning marine layer. Model your own site rather than relying on a regional rule of thumb.

Questions to ask any installer

  • Which export credit values and lock-in period did you use in this proposal?
  • What share of the system’s output do you expect me to use on site?
  • Which rate schedule did you model, and do I need to change rates?
  • How would adding a battery change my savings?
  • What will my bill look like in a typical summer and winter month?

If a proposal promises savings without showing a self-consumption estimate, ask for one. That number is the heart of the economics under net billing. Ask for the assumptions behind it too, including the operating hours and seasonal load the installer used. A self-consumption estimate built on a generic office profile tells you little about a brewery, a dental office or a cold storage facility.

Common mistakes to avoid

The most common mistake is comparing new proposals to the payback a neighbor got under NEM 2.0. The rules changed, so the old numbers don’t transfer. The second is buying the largest system the roof can hold. The third is ignoring fixed and non-bypassable charges that remain on your bill no matter how much solar you install. A good proposal shows all three clearly.

Rules also change over time. The CPUC revisits rate design and fixed charges, and export values are updated. Build your decision around today’s terms, but expect some movement over a system’s life.

How chamber membership helps

Net billing made commercial solar more technical, which makes honest advice more valuable. The San Diego Green Chamber connects businesses with solar and storage firms that commit, as every member does, to reducing energy and water use. Browse installers in the Member Business Directory, see how the chamber supports the solar and storage industry, and bring your questions to free networking events co-hosted with San Diego Green Drinks. The chamber also offers a unified voice on policy issues like this one. Learn about membership.

Questions

What is the difference between NEM and net billing?

Under the older NEM programs, exported solar earned close to the retail rate. Under net billing, exports earn hourly credit values that are generally much lower, so using solar on site matters more.

Does net billing apply to businesses?

Yes. It applies to most new solar customers of SDG&E, PG&E and SCE, including commercial customers, for applications submitted from April 15, 2023.

Will I lose my NEM terms if I already have solar?

Existing NEM customers generally keep their terms for a legacy period from their original interconnection. Major system changes can affect that, so check with SDG&E before expanding.

Do I need a battery under net billing?

Not always, but storage often improves the return by shifting midday solar into the evening peak. Ask your installer to model both options.