CALGreen requirements explained for contractors

CALGreen is California's statewide green building code, and its mandatory measures apply to most new construction. Here is what contractors need to plan, build and document.

By the San Diego Green Chamber · Updated November 2026

Contractor and inspector reviewing a checklist at a construction site

CALGreen is California’s Green Building Standards Code, Part 11 of Title 24, and its mandatory measures apply to most new buildings and many additions and alterations statewide. For contractors it means specific requirements for construction waste diversion, EV charging readiness, water-efficient fixtures, low-emitting materials and documentation. Cities can add stricter local rules, so always check the jurisdiction where you’re building.

How CALGreen is structured

CALGreen has mandatory measures that apply everywhere, plus two voluntary tiers, Tier 1 and Tier 2, with stronger requirements. Local jurisdictions can adopt the tiers or their own amendments as local law, which makes them mandatory there. Nonresidential provisions are developed through the California Building Standards Commission, and residential provisions through the Department of Housing and Community Development.

The code is generally updated on the same three-year cycle as the rest of Title 24, though 2025 state legislation (AB 130) paused most new residential building standards until mid-2031. The edition that applies to your project generally depends on when the permit application is submitted. Energy efficiency requirements live in Part 6, which our guide on the Title 24 energy code for commercial projects covers.

The mandatory measures contractors handle most

CALGreen groups requirements by topic. These are the ones that land on contractors most often.

Planning and design

  • Stormwater and erosion control during construction.
  • EV charging: EV capable spaces with raceway and panel capacity, and in recent editions installed chargers for many projects. Requirements scale with the number of parking spaces.
  • Bicycle parking and designated parking for clean air vehicles on many nonresidential projects.
  • Light pollution limits for outdoor lighting on nonresidential sites.

Water efficiency

  • Maximum flow rates for toilets, urinals, faucets and showerheads.
  • Outdoor water efficiency for new landscaping, typically through the state’s model water efficiency ordinance (MWELO) or a stricter local version. In San Diego County, water agencies may add their own requirements.
  • Water submeters for some nonresidential tenant spaces and larger users.

Material conservation

  • Diversion of at least 65 percent of nonhazardous construction and demolition waste, or a local requirement that is stricter.
  • Recycling and organics storage areas in new buildings.
  • Moisture control and weather protection details.

Environmental quality

  • VOC limits for adhesives, sealants, paints and coatings, and emission limits for carpet, resilient flooring and composite wood.
  • Protecting ducts and equipment from dust during construction.
  • Minimum filtration for mechanical ventilation systems.

Larger new nonresidential buildings also require commissioning, with an owner’s project requirements document, a basis of design and a commissioning plan. Check the current size threshold for your project type.

Documentation is half the job

Most CALGreen problems at final inspection are paperwork problems. Plan for:

  1. A CALGreen checklist or code notes on the plans showing which measures apply.
  2. A construction waste management plan before demolition starts.
  3. Weight tickets or facility reports proving diversion, from certified facilities where the jurisdiction requires it.
  4. Product data sheets showing VOC and emission compliance for finishes, kept on site.
  5. Fixture cut sheets showing flow rates.
  6. Commissioning reports and EV charging documentation where required.

Assign one person on the job to collect these as you go. Chasing VOC data sheets from a painter three months after they finished is how finals get delayed.

Push the requirements down to subcontractors in writing. Put VOC limits in the painting and flooring scopes, fixture flow rates in the plumbing scope, and waste sorting rules in every scope. Ask for product data at submittal, not at closeout. When a sub substitutes a product, check its compliance before it goes on the wall. A non-compliant adhesive found at final inspection is expensive to fix and hard to explain to the owner.

San Diego specifics

Each jurisdiction in San Diego County enforces CALGreen through its building department, and some adopt local amendments. The City of San Diego’s Development Services Department handles plan review and inspections in the city, and its Environmental Services Department oversees construction and demolition debris diversion. Coastal and North County cities have adopted their own reach measures in some areas, such as EV charging. Read the local amendments before you price a job, and ask plan check if a requirement is unclear.

Inspectors in different jurisdictions also focus on different items. One may want diversion reports at every inspection, another only at final. When you work across several cities in the county, keep a short note for each one on what its inspectors ask for, and share it with your project managers.

Turning compliance into an advantage

Owners and general contractors increasingly ask subcontractors about sustainability in bids. A contractor who can say, with documents, that their last ten jobs met diversion targets and used compliant low-VOC products has something specific to offer. That record is proof, which beats a vague claim. Keep a simple log of diversion rates and product compliance by project, and use it in your proposals.

It also helps on cost. Contractors who know CALGreen price it correctly the first time, avoid rework and move through inspections faster. That reliability is what owners and general contractors remember when the next bid comes around.

How the chamber helps

The San Diego Green Chamber connects contractors with green building and construction firms, recyclers and suppliers who know CALGreen, so you can find a certified facility or a compliant product through a peer. Every member commits to reducing energy and water use, and the chamber offers education, resources and a unified voice on building policy. See what membership includes.

Questions

What is CALGreen?

California’s Green Building Standards Code, Part 11 of Title 24. It sets mandatory green building measures for most new construction and many additions and alterations.

What is the CALGreen construction waste requirement?

At least 65 percent of nonhazardous construction and demolition waste must be diverted from landfill, unless the local jurisdiction requires more.

What are CALGreen Tier 1 and Tier 2?

Voluntary sets of stronger measures. They become mandatory only where a city or county adopts them locally.

Does CALGreen require EV chargers?

It requires EV capable parking and, in recent editions, installed chargers for many projects, scaled to the number of parking spaces. Check the edition and local amendments.